Home
Products
CNC Machining
Sheet Metal Fabrication
Stamping
Injection Molding
Customization
Customisation Introduction
Advantage
Customisation Process
Services
About us
Company Profile
History
Certificates
Partner
Company reality
Contact us
Cases
Blog
Company News
Industry News
FAQ
Video Center
Knowledge
Jul 31,2025
2. How long does the product customization cycle take?
Regular orders can be completed within 15 working days after receiving advance payment and drawing confirmation. However, if the order is complex, the process requirements are high, or the raw material procurement cycle is long, the time will be extended accordingly, and the specific time will be clearly informed in the communication.
3. Which materials can be customized hardware products?
Common products such as stainless steel, aluminum alloy, copper alloy, etc., can be customized. Different materials have different characteristics, such as stainless steel anti-rust ability, aluminum alloy light weight, high strength, you can choose according to the use of the product scenario and performance needs.
4. How accurate can customized products be?
Our advanced processing equipment and mature technology, the dimensional accuracy is generally up to ±0.05mm, for high-precision products, through special technology and equipment, the accuracy can be controlled at ±0.01mm, to meet your various precision needs.
5. How to ensure the quality of customized products?
From the procurement of raw materials to strictly control, each batch of materials have a quality inspection report. During the production process, the quality inspection personnel carry out random inspection in each process, and the finished product is fully inspected after completion to ensure that the product meets your requirements and industry standards.
Jul 24,2025
Are you a manufacturer or a trading company?
We are a manufacturer, we have ISO9001/IATF16949 certificated manufacturer with a wide range of advanced equipment.
What is the MOQ?
We accept 1 sample, MOQ depends on our client’s needs, besides, we welcome trial order before mass-production.